Final Work Being Done in the Sacristy
Marble Floor with Inlay for Baptismal Font
New Front Garden Area Being Prepared
Ceiling Being Installed in New Addition
New Addition Front Side
New Locationof Sacred Heart Statue
Exterior Sides of New Confessional
Being Finished.
Entrance to New Confessoinal
With New Rose Window
New Garden Area and Entrance to New Addtion Being Finished
New Fence and Gate Around the New Garden
Brick Walk Way Being Installed
The New Carpet and Marble Floor Are Installed and are Ready for the Pews