Photo Gallery 1 of Renovation Work at Sacred Heart Church
Choir Loft Before Restoration
Interior of Church Before Restoration
Sanctuary Before Restoration
Laying Down New Concrete Base for Marble Floor
Preparing Base for new Marble Floor
Finished Concrete base for New
Marble Floor
There was a lot of Noise and Heavy Equipment During the first
Phase of Renovation
Scaffolding Goes up all the way to the ceiling and around all the walls
New Ceiling Lamps are
Tried for Size
High Above Work Begins on the Ceiling
Scaffolding Blocks the View of all the
Work being Done
Foundation is Laid for the Addition of Bathrooms and Bride's Room
The Food Distribution Program  Continues to
Operate During the Renovation Work
The Walls Start to go up for the Bathroom Addition on the
Side of the Church
Work Begins on the Windows
Work in Progress for the
New Confessionals
Part of the New Ceiling Is Seen through the Scaffolding with some of the Old Stained Glass Windows not yet Removed by Choir Loft
Detail of the New Altar
New Altar Being Installed.
New Addition continues to Grow
With the Help Of Heavy Equipment and Lot of Noise
THE NEXT PHOTO GALLERY (No. 2) WILL SHOW THE RESULTS OF
THE RENOVATION WORK!
The New Background Altar for the Tabernacle
begins to be Installed Behind all the Scaffolding.